{"id":5422,"date":"2025-04-23T14:56:59","date_gmt":"2025-04-23T18:56:59","guid":{"rendered":"https:\/\/swtchenergy.com\/?p=5422"},"modified":"2025-04-23T14:56:59","modified_gmt":"2025-04-23T18:56:59","slug":"fast-ev-charging-zero-costs-calevip-funding-open-in-july","status":"publish","type":"post","link":"https:\/\/swtchenergy.com\/blog\/incentives\/fast-ev-charging-zero-costs-calevip-funding-open-in-july\/","title":{"rendered":"Fast EV Charging, Zero Costs: CALeVIP Funding Open in July"},"content":{"rendered":"<p class=\"\" data-start=\"282\" data-end=\"679\">With California\u2019s EV adoption continuing to surge, the state is doubling down on infrastructure to match. Through the <strong data-start=\"400\" data-end=\"443\">Fast Charge California Project (FCCP-1)<\/strong>\u2014a major new incentive from the <strong data-start=\"475\" data-end=\"539\">California Electric Vehicle Infrastructure Project (CALeVIP)<\/strong>\u2014at least <strong data-start=\"549\" data-end=\"575\">$55 million in funding<\/strong> is now available to accelerate the deployment of <strong data-start=\"625\" data-end=\"661\">DC Fast Charging (DCFC) stations<\/strong> across the state.<\/p>\n<p class=\"\" data-start=\"681\" data-end=\"887\">For property owners, developers, and site hosts, this is a golden opportunity to bring high-powered public charging to strategic sites\u2014backed by incentives that could <strong data-start=\"848\" data-end=\"886\">cover up to 100% of eligible costs<\/strong>.<\/p>\n<h3 class=\"\" data-start=\"889\" data-end=\"916\">Key Details at a Glance<\/h3>\n<ul data-start=\"918\" data-end=\"1537\">\n<li class=\"\" data-start=\"918\" data-end=\"979\">\n<p class=\"\" data-start=\"920\" data-end=\"979\"><strong data-start=\"920\" data-end=\"942\">Application Window<\/strong>: July 8, 2025 \u2013 September 30, 2025<\/p>\n<\/li>\n<li class=\"\" data-start=\"980\" data-end=\"1021\">\n<p class=\"\" data-start=\"982\" data-end=\"1021\"><strong data-start=\"982\" data-end=\"995\">Geography<\/strong>: Statewide (California)<\/p>\n<\/li>\n<li class=\"\" data-start=\"1022\" data-end=\"1069\">\n<p class=\"\" data-start=\"1024\" data-end=\"1069\"><strong data-start=\"1024\" data-end=\"1045\">Funding Available<\/strong>: At least $55 million<\/p>\n<\/li>\n<li class=\"\" data-start=\"1070\" data-end=\"1224\">\n<p class=\"\" data-start=\"1072\" data-end=\"1224\"><strong data-start=\"1072\" data-end=\"1095\">Eligible Applicants<\/strong>: California-based businesses, nonprofits, government entities, Native American tribes, or businesses with a CA-based affiliate<\/p>\n<\/li>\n<li class=\"\" data-start=\"1225\" data-end=\"1346\">\n<p class=\"\" data-start=\"1227\" data-end=\"1346\"><strong data-start=\"1227\" data-end=\"1247\">Funding Priority<\/strong>: Sites in Disadvantaged Communities (DACs), Low-Income Communities (LICs), or Tribal Lands (TLs)<\/p>\n<\/li>\n<li class=\"\" data-start=\"1347\" data-end=\"1465\">\n<p class=\"\" data-start=\"1349\" data-end=\"1370\"><strong data-start=\"1349\" data-end=\"1367\">Incentive Caps:<\/strong><\/p>\n<ul data-start=\"918\" data-end=\"1537\">\n<li class=\"\" data-start=\"1347\" data-end=\"1465\">\n<p class=\"\" data-start=\"1349\" data-end=\"1370\"><strong data-start=\"1376\" data-end=\"1396\">$55,000 per port<\/strong> (150 kW\u2013274.99 kW)<\/p>\n<\/li>\n<li class=\"\" data-start=\"1421\" data-end=\"1465\">\n<p class=\"\" data-start=\"1423\" data-end=\"1465\"><strong data-start=\"1423\" data-end=\"1444\">$100,000 per port<\/strong> (275 kW or higher)<\/p>\n<\/li>\n<\/ul>\n<\/li>\n<li class=\"\" data-start=\"1466\" data-end=\"1537\">\n<p class=\"\" data-start=\"1468\" data-end=\"1537\"><strong data-start=\"1468\" data-end=\"1485\">Site Capacity<\/strong>: Minimum of 4 ports, maximum of 20 ports per site<\/p>\n<\/li>\n<\/ul>\n<hr class=\"\" data-start=\"1539\" data-end=\"1542\" \/>\n<h3 class=\"\" data-start=\"1544\" data-end=\"1575\">What Projects Are Eligible?<\/h3>\n<p class=\"\" data-start=\"1577\" data-end=\"1669\">To qualify, applicants must meet <strong data-start=\"1610\" data-end=\"1636\">Tier 1: Ready to Build<\/strong> criteria, which includes having:<\/p>\n<ol data-start=\"1671\" data-end=\"1844\">\n<li class=\"\" data-start=\"1671\" data-end=\"1724\">\n<p class=\"\" data-start=\"1674\" data-end=\"1724\">\u00a0A finalized <strong data-start=\"1686\" data-end=\"1696\">permit<\/strong> for the installation, and<\/p>\n<\/li>\n<li class=\"\" data-start=\"1725\" data-end=\"1844\">\n<p class=\"\" data-start=\"1728\" data-end=\"1844\">\u00a0Either a completed <strong data-start=\"1747\" data-end=\"1773\">utility service design<\/strong> or official documentation confirming no new utility service is needed.<\/p>\n<\/li>\n<\/ol>\n<p class=\"\" data-start=\"1846\" data-end=\"2071\">Projects must be <strong data-start=\"1863\" data-end=\"1886\">publicly accessible<\/strong>, located on <strong data-start=\"1899\" data-end=\"1926\">existing paved surfaces<\/strong>, and fall within approved site types\u2014ranging from grocery stores and gas stations to libraries, medical facilities, city parking lots, and more.<\/p>\n<p class=\"\" data-start=\"2073\" data-end=\"2153\">\ud83d\udccd <em data-start=\"2076\" data-end=\"2082\">Note<\/em>: Sites tied to new construction or unpaved locations are not eligible.<\/p>\n<hr class=\"\" data-start=\"2155\" data-end=\"2158\" \/>\n<h3 class=\"\" data-start=\"2160\" data-end=\"2187\">What Costs Are Covered?<\/h3>\n<p class=\"\" data-start=\"2189\" data-end=\"2337\">FCCP-1 is one of the most comprehensive fast-charging incentive programs in the country. It covers nearly all aspects of DCFC deployment, including:<\/p>\n<ul data-start=\"2339\" data-end=\"2925\">\n<li class=\"\" data-start=\"2339\" data-end=\"2454\">\n<p class=\"\" data-start=\"2341\" data-end=\"2454\"><strong data-start=\"2341\" data-end=\"2365\">Hardware &amp; Equipment<\/strong>: DCFCs, switchgear, panels, energy storage, and all-inclusive solar EV charging systems.<\/p>\n<\/li>\n<li class=\"\" data-start=\"2455\" data-end=\"2564\">\n<p class=\"\" data-start=\"2457\" data-end=\"2564\"><strong data-start=\"2457\" data-end=\"2479\">Installation Costs<\/strong>: Labor and materials for construction, trenching, electrical work, paving, and more.<\/p>\n<\/li>\n<li class=\"\" data-start=\"2565\" data-end=\"2671\">\n<p class=\"\" data-start=\"2567\" data-end=\"2671\"><strong data-start=\"2567\" data-end=\"2587\">Utility Upgrades<\/strong>: Transformer upgrades, new service lines, and coordination with electric utilities.<\/p>\n<\/li>\n<li class=\"\" data-start=\"2672\" data-end=\"2780\">\n<p class=\"\" data-start=\"2674\" data-end=\"2780\"><strong data-start=\"2674\" data-end=\"2698\">Design &amp; Engineering<\/strong>: Site layout planning, electrical design, ADA compliance, and technical drawings.<\/p>\n<\/li>\n<li class=\"\" data-start=\"2781\" data-end=\"2925\">\n<p class=\"\" data-start=\"2783\" data-end=\"2925\"><strong data-start=\"2783\" data-end=\"2795\">Services<\/strong>: Network data plans, service level agreements, signage, shipping, warranty extensions, and payment hardware (e.g., card readers).<\/p>\n<\/li>\n<\/ul>\n<p class=\"\" data-start=\"2927\" data-end=\"3107\">\ud83d\uded1 <em data-start=\"2930\" data-end=\"2948\">Ineligible costs<\/em> include permitting, standalone solar panels, lighting, fencing, and any expenses incurred before January 31, 2025 or before July 8, 2025 construction kickoff.<\/p>\n<hr class=\"\" data-start=\"3109\" data-end=\"3112\" \/>\n<h3 class=\"\" data-start=\"3114\" data-end=\"3148\">Application &amp; Project Timeline<\/h3>\n<ul data-start=\"3150\" data-end=\"3393\">\n<li class=\"\" data-start=\"3150\" data-end=\"3195\">\n<p class=\"\" data-start=\"3152\" data-end=\"3195\"><strong data-start=\"3152\" data-end=\"3169\">Apply between<\/strong>: July 8 \u2013 Sept 30, 2025<\/p>\n<\/li>\n<li class=\"\" data-start=\"3196\" data-end=\"3254\">\n<p class=\"\" data-start=\"3198\" data-end=\"3254\"><strong data-start=\"3198\" data-end=\"3220\">Start construction<\/strong>: <em data-start=\"3222\" data-end=\"3239\">No earlier than<\/em> July 8, 2025<\/p>\n<\/li>\n<li class=\"\" data-start=\"3255\" data-end=\"3322\">\n<p class=\"\" data-start=\"3257\" data-end=\"3322\"><strong data-start=\"3257\" data-end=\"3276\">Receive funding<\/strong>: Within 15 days of approval &amp; documentation<\/p>\n<\/li>\n<li class=\"\" data-start=\"3323\" data-end=\"3393\">\n<p class=\"\" data-start=\"3325\" data-end=\"3393\"><strong data-start=\"3325\" data-end=\"3356\">Project completion deadline<\/strong>: 450 days after funds are reserved<\/p>\n<\/li>\n<\/ul>\n<p class=\"\" data-start=\"3395\" data-end=\"3575\">Applications will be reviewed <strong data-start=\"3425\" data-end=\"3453\">first-come, first-served<\/strong>, with priority given to DAC, LIC, and TL sites. Once funds are reserved, the clock starts ticking\u2014so early action is key.<\/p>\n<hr class=\"\" data-start=\"3577\" data-end=\"3580\" \/>\n<h3 class=\"\" data-start=\"3582\" data-end=\"3604\">How SWTCH Can Help<\/h3>\n<p class=\"\" data-start=\"3606\" data-end=\"3775\">Deploying fast-charging isn\u2019t just about buying hardware\u2014it\u2019s about meeting the complex requirements of modern incentive programs and building a solution that will last.<\/p>\n<p class=\"\" data-start=\"3777\" data-end=\"4083\">At SWTCH, we offer end-to-end DCFC project support\u2014from initial site assessments and application strategy to hardware, installation coordination, and ongoing operations. <strong data-start=\"3947\" data-end=\"4017\">Our team ensures your project complies with all CALeVIP guidelines<\/strong> and is positioned for a successful and timely incentive approval.<\/p>\n<p class=\"\" data-start=\"4085\" data-end=\"4190\">With millions in funding available and competition heating up, now is the time to get ahead of the curve.<\/p>\n<p class=\"\" data-start=\"4192\" data-end=\"4263\">\ud83d\udc49 <strong data-start=\"4195\" data-end=\"4209\">Let\u2019s talk<\/strong> about your site\u2019s eligibility and how to get started.<\/p>\n<p class=\"\" data-start=\"4265\" data-end=\"4341\">\ud83d\udce9 <a href=\"https:\/\/swtchenergy.com\/contact\/\" target=\"_new\" rel=\"noopener\" data-start=\"4268\" data-end=\"4341\">Contact us to speak with an expert<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With California\u2019s EV adoption continuing to surge, the state is doubling down on infrastructure to match. Through the Fast Charge California Project (FCCP-1)\u2014a major new incentive from the California Electric Vehicle Infrastructure Project (CALeVIP)\u2014at least $55 million in funding is now available to accelerate the deployment of DC Fast Charging (DCFC) stations across the state. [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":4463,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"slim_seo":{"title":"Fast EV Charging, Zero Costs: CALeVIP Funding Open in July","description":"With California\u2019s EV adoption continuing to surge, the state is doubling down on infrastructure to match. Through the Fast Charge California Project (FCCP-1) \u2014a"},"footnotes":""},"categories":[48],"tags":[],"class_list":["post-5422","post","type-post","status-publish","has-post-thumbnail","hentry","category-incentives"],"acf":[],"lang":"en","translations":{"en":5422},"pll_sync_post":[],"_links":{"self":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts\/5422","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/comments?post=5422"}],"version-history":[{"count":2,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts\/5422\/revisions"}],"predecessor-version":[{"id":5424,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts\/5422\/revisions\/5424"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/media\/4463"}],"wp:attachment":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/media?parent=5422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/categories?post=5422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/tags?post=5422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}