{"id":2927,"date":"2024-01-16T11:07:23","date_gmt":"2024-01-16T16:07:23","guid":{"rendered":"https:\/\/swtchenergy.com\/?p=2927"},"modified":"2025-12-11T11:38:16","modified_gmt":"2025-12-11T16:38:16","slug":"incentive-charge-ahead-colorado-is-now-open-funding-90-for-ev-charging-projects","status":"publish","type":"post","link":"https:\/\/swtchenergy.com\/blog\/incentives\/incentive-charge-ahead-colorado-is-now-open-funding-90-for-ev-charging-projects\/","title":{"rendered":"Charge Ahead Colorado is now open: Funding 80% &#8211; 90% for EV Charging Projects"},"content":{"rendered":"<p><b>Since its inception in 2013, the Charge Ahead Colorado grant program has made awards for more than 2,000 EV charging stations across the state, and it&#8217;s back open for applications!<\/b><\/p>\n<p>As of January 2024, the Colorado Energy Office (CEO) will continue their &#8220;Charge Ahead Colorado&#8221; grant funding program, which provides 80-90% in grant funding up to $70K plus incentives for installing community-based Level 2 (L2) and DC fast-chargers. But the funding won&#8217;t last forever, the next round will take place between January 16th- February 16th 2024. As a national EV charging leader, SWTCH is here to help. As a Bronze Level sponsor for the <a href=\"https:\/\/drivecleancolorado.org\/about-us\/our-members\">Drive Clean Colorado coalition <\/a>\u00a0, we are very familiar with the funding process and needs of properties across the state &#8211; if interested in learning more about getting funding for EV charging on your properties, <a style=\"font-weight: bold;\" href=\"https:\/\/swtchenergy.com\/contact\">get in touch with us asap.<\/a><\/p>\n<h2><b>Program Summary &amp; Incentive Amounts<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">CEO is looking to grant funding up to $70K plus incentives for installing community-based Level 2 (L2) and DC fast-chargers to help prepare for the growing demand in electric vehicles with objectives of improving air quality, reducing transportation emissions, and increasing adoption of electric vehicles across Colorado. To help facilitate this change, CEO is offering the following incentives:\u00a0<\/span><\/p>\n<div class=\"rich-text\" data-testid=\"rich-text\">\n<table border=\"1\">\n<tbody>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b<strong>EV Charging Station Power Level<\/strong><\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b<strong>\u200bCEO Maximum\u00a0Funding<\/strong><\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b<strong>\u200bMaximum Incentive<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">Level 2 (Under 19kW), Per Port<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b80%<\/td>\n<td style=\"padding: 10px; align-item: center;\">$4,500<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">19 &#8211; 49\u00a0kW,\u00a0Per Port<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b80%<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b$6,250<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">DCFC, Single-Port (50 &#8211; 99kW)<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b80%<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b$35,000<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">DCFC, Dual-Port (50 &#8211; 99kW capable of simultaneous charging at this power level)<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b80%<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b$50,000<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">DCFC, Single-Port (100kW+)<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b80%<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b$50,000<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200bDCFC, Dual-Port (100kW+ capable of simultaneous charging at this power level)<\/td>\n<td style=\"padding: 10px; align-item: center;\">80%<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b$70,000<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2 class=\"horizontal-space-bottom\" data-testid=\"section-title\"><\/h2>\n<table border=\"1\">\n<tbody>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b<strong>Enhanced Incentives<\/strong><\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b<strong>\u200bCEO Maximum\u00a0Funding<\/strong><\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b<strong>\u200bMaximum Additional\u00a0Incentive\u00a0<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">Level 2 Income Qualified Enhanced Incentive (Per Port)<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b90%<\/td>\n<td style=\"padding: 10px; align-item: center;\">+$1,250<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">Enhanced Incentive for Qualified Entities in Disproportionately Impacted Communities (Per Port)**<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b90%<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200b\u200b+$500<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>**For the Disproportionately Impacted Community (DI) enhanced incentive, eligible applicants must be located within a disproportionately impacted community\u00a0<em><strong>and<\/strong><\/em> be a Qualifying Entity type (see below).<\/p>\n<div class=\"paragraph__title title_color \">\n<h2 class=\"field field--name-field-card-title field--type-string field--label-hidden field--item\"><strong>Who&#8217;s eligible?<\/strong><\/h2>\n<p>The following entities are eligible for funding:<\/p>\n<ul>\n<li>Libraries<\/li>\n<li>Community centers<\/li>\n<li>Recreation centers<\/li>\n<li>Nonprofit organizations<\/li>\n<li>Schools<\/li>\n<li>Places of worship<\/li>\n<li>Multifamily housing (MFH) IQ eligible organizations<\/li>\n<\/ul>\n<h2 class=\"field field--name-field-card-title field--type-string field--label-hidden field--item\"><strong>What&#8217;s the Application Timeline?<\/strong><\/h2>\n<\/div>\n<div class=\"field field--name-field-card-body field--type-text-long field--label-hidden field--item\">\n<p>The next standard application round will begin on January 16, 2024, and end on February 16, 2024, at 5:00 PM MT. The Colorado Energy Office\u00a0anticipates awarding approximately $3M total during this round.<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<div class=\"rich-text\" data-testid=\"rich-text\">\n<table border=\"1\">\n<tbody>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">\u200b<strong>Actions<\/strong><\/td>\n<td style=\"padding: 10px; align-item: center;\"><strong>Date<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">Application period opens<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200bJanuary 16, 2024<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">Question submittal deadline<\/td>\n<td style=\"padding: 10px; align-item: center;\">January 23, 2024<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">Q&amp;A responses posted<\/td>\n<td style=\"padding: 10px; align-item: center;\">\u200bJanuary 26, 2024, 5:00 PM MT<\/td>\n<\/tr>\n<tr>\n<td style=\"padding: 10px; align-item: center;\">Application period opens<\/td>\n<td style=\"padding: 10px; align-item: center;\">February 16, 2024, 5:00 PM MT<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div><\/div>\n<h2><strong>How do I Apply?<\/strong><\/h2>\n<div class=\"field field--name-field-card-body field--type-text-long field--label-hidden field--item\">\n<p>All Charge Ahead Colorado applications\u00a0<strong>must be submitted online through the application portal (<\/strong><a class=\"btn btn-dark-blue border-color no-radius\" href=\"https:\/\/coenergyoffice.force.com\/zeroemissiongrants\/\"><span class=\"text\">Online Application Portal).\u00a0<\/span><\/a><\/p>\n<p>For preparation purposes, Word formatted versions of the standard and rolling application are available for download.<\/p>\n<ul>\n<li><a href=\"https:\/\/docs.google.com\/document\/d\/19cKuOeCZaTOO5Xm5KJWIDUsKX7eW_HHt\/edit?usp=sharing&amp;ouid=106781423732803161388&amp;rtpof=true&amp;sd=true\">Standard Application preparation document<\/a><\/li>\n<li><a href=\"https:\/\/docs.google.com\/document\/d\/1MklG65_kXAYay5WUd_M78qYrfnj80_aL\/edit?usp=sharing&amp;ouid=106781423732803161388&amp;rtpof=true&amp;sd=true\">Rolling Application preparation document<\/a><\/li>\n<\/ul>\n<p><strong>Please note:<\/strong>\u00a0There is a 3,000 character limit per question. Additionally, applications cannot be edited or updated once fully submitted. Applicants are therefore strongly encouraged to use the Word formatted application preparation documents above to prepare their responses and then to copy and paste them into the online application portal when ready.<\/p>\n<p>Applications will\u00a0<em><strong>not<\/strong><\/em> be accepted via email or physical submission such as mail.<\/p>\n<\/div>\n<h2><strong>How SWTCH can help?<\/strong><\/h2>\n<p><span style=\"font-weight: 400;\">SWTCH is a national leader of EV charging solutions for multifamily and commercial properties by crafting a tailored system that is specific to the needs of our clients and their property.\u00a0 Across North America, we have deployed and are managing more than 10,000 chargers on our network.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Don&#8217;t miss out on this chance to electrify your property and be a part of Colorado&#8217;s sustainable future. <\/span><span style=\"font-weight: 400;\">To learn more about SWTCH, check out our <\/span><a href=\"https:\/\/swtchenergy.com\/multifamily\"><span style=\"font-weight: 400;\">multifamily<\/span><\/a><span style=\"font-weight: 400;\"> and <\/span><a href=\"https:\/\/swtchenergy.com\/workplace\"><span style=\"font-weight: 400;\">workplace<\/span><\/a><span style=\"font-weight: 400;\"> EV Charging solutions, and if interested in learning more about the funding opportunity and your eligibility, <\/span><a href=\"https:\/\/swtchenergy.comhttps:\/\/swtchenergy.com\/contact\/\"><span style=\"font-weight: 400;\">get in touch with us asap.<\/span><\/a><\/p>\n<figure id=\"attachment_2286\" aria-describedby=\"caption-attachment-2286\" style=\"width: 1230px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"size-full wp-image-2286\" src=\"https:\/\/swtchenergy.com\/uploads\/2023\/07\/SWTCH-Photoshoot-Nov-2022-social.jpg\" alt=\"SWTCH Photoshoot (Nov 2022)-social\" width=\"1230\" height=\"644\" srcset=\"https:\/\/swtchenergy.com\/uploads\/2023\/07\/SWTCH-Photoshoot-Nov-2022-social.jpg 1230w, https:\/\/swtchenergy.com\/uploads\/2023\/07\/SWTCH-Photoshoot-Nov-2022-social-300x157.jpg 300w, https:\/\/swtchenergy.com\/uploads\/2023\/07\/SWTCH-Photoshoot-Nov-2022-social-1024x536.jpg 1024w, https:\/\/swtchenergy.com\/uploads\/2023\/07\/SWTCH-Photoshoot-Nov-2022-social-768x402.jpg 768w\" sizes=\"(max-width: 1230px) 100vw, 1230px\" \/><figcaption id=\"caption-attachment-2286\" class=\"wp-caption-text\"><em>Man accessing SWTCH branded EV Charger to charge his vehicle<\/em><\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Since its inception in 2013, the Charge Ahead Colorado grant program has made awards for more than 2,000 EV charging stations across the state, and it&#8217;s back open for applications! As of January 2024, the Colorado Energy Office (CEO) will continue their &#8220;Charge Ahead Colorado&#8221; grant funding program, which provides 80-90% in grant funding up [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":2950,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"slim_seo":{"title":"Charge Ahead Colorado is now open: Funding 80% - 90% for EV Charging Projects","description":"As of January 2024, the Colorado Energy Office (CEO) will continue their \"Charge Ahead Colorado\" grant funding program, which provides 80-90% in grant funding up to $70K plus incentives for installing community-based Level 2 (L2) and DC fast-chargers."},"footnotes":""},"categories":[48],"tags":[],"class_list":["post-2927","post","type-post","status-publish","has-post-thumbnail","hentry","category-incentives"],"acf":[],"lang":"en","translations":{"en":2927},"pll_sync_post":[],"_links":{"self":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts\/2927","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/comments?post=2927"}],"version-history":[{"count":22,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts\/2927\/revisions"}],"predecessor-version":[{"id":6495,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts\/2927\/revisions\/6495"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/media\/2950"}],"wp:attachment":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/media?parent=2927"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/categories?post=2927"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/tags?post=2927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}