{"id":2330,"date":"2023-07-25T16:19:20","date_gmt":"2023-07-25T20:19:20","guid":{"rendered":"https:\/\/swtchenergy.com\/?p=2330"},"modified":"2023-08-28T14:43:58","modified_gmt":"2023-08-28T18:43:58","slug":"illinois-ev-charging-act","status":"publish","type":"post","link":"https:\/\/swtchenergy.com\/blog\/ev-insights\/illinois-ev-charging-act\/","title":{"rendered":"Key Considerations for Developers under the Illinois EV Charging Act: Mitigate Costs (and Future Headaches)"},"content":{"rendered":"<p><em><span style=\"font-weight: 400;\">Illinois will see the new Electric Vehicle Charging Act go into effect on January 1, 2024. The regulation forces new multifamily properties to offer EV charging for all residents, a tall order that could add hundreds of thousands of dollars to construction costs.<\/span><\/em><\/p>\n<p><span style=\"font-weight: 400;\">For newly constructed large multifamily buildings or large multifamily buildings being renovated by a developer converting the property into an association, 100% of parking spaces need to be \u201cEV-capable\u201d. If you fear this will lead to added costs for you as a developer, you are spot on. Even though EV numbers are on the rise, there is no indication of when we will see charger demand in specific buildings reach anywhere close to 100%. Despite this, the law can be used to create a competitive advantage. Here is how.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">What does \u201cEV capable\u201d mean?<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The act requires at least one \u201celectric vehicle capable parking space\u201d for each residential unit. The good news is that you don\u2019t have to install charging hardware on each parking spot. EV-capable means the electrical capacity has to be established in the building, and conduit runs must be completed for future installation of EV chargers.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The law requires enough capacity for dedicated 40 amp circuits with a minimum of 208 V or 240 V unless you have load management in place. Detailed electrical planning is advisable, with load management becoming a tool to reduce cost.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">How developers\u00a0can effectively handle the changes<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Preparing a building to accommodate EV chargers for every parking spot can be daunting. The electrical capacity needed can be enormous. Looking at a property with 200 units and one parking spot each, you would generally need about 8,000 amps. Apart from issues caused by regional grid restrictions, the construction cost has just made a significant jump.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"><div class=\"c-quote\">\n                <span class=\"c-quote_icon\">\u201c<\/span>\n                <blockquote class=\"c-heading -h3\">\n                    Load management is the single most important tool to save significant money on the construction side of things. Our clients are thrilled with SWTCH Control, our load-sharing solution we\u2019ve installed at several high-end buildings in Chicago\n                <\/blockquote><\/div>\u00a0<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">What is Load Management?\u00a0<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Load management is the ability to share electricity with multiple electric vehicles simultaneously. <\/span><a href=\"https:\/\/swtchenergy.com\/technology\"><span style=\"font-weight: 400;\">SWTCH Control<\/span><\/a><span style=\"font-weight: 400;\"> is a sophisticated load management system that dynamically shares the available load between multiple chargers, ensuring that all connected vehicles are charged and ready to go by the morning. The impact of employing a load management solution like SWTCH Control is that you don\u2019t need to accommodate\u00a0full capacity for 100% of parking spaces, which will save a tremendous amount of money.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Getting SWTCH involved in the design phase is critical as it\u2019ll allow you to reduce the up-front electrical capacity significantly. It could mean cutting a required 8,000 amps down to 2,000 amps. In an example of a typical 4:1 load-sharing ratio, the cost reductions could look as follows:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">Total Capacity Required: <\/span><b>Up to 75% less amperage needed<\/b><\/li>\n<li>Power Supply from Panel: <b>Up to 67% savings on labor and material<\/b><\/li>\n<li>Distribution to Parking Spaces: <b>Up to 75% savings in material and labor<\/b><\/li>\n<\/ul>\n<p><iframe title=\"YouTube video player\" src=\"https:\/\/www.youtube.com\/embed\/zqa_tES5nFQ\" width=\"800\" height=\"450\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<h2><span style=\"font-weight: 400;\">Unit owners and tenants will have the right to install a charger<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The new act also states that condominiums must allow residents to install chargers at their parking spots. They cannot prohibit or unreasonably restrict the installation of EV chargers for unit owners. Further regulations for condo associations include a 60-day approval\/denial period for charger applications from unit owners and a subset of rules for installing chargers in common areas.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Similar rules apply for rental properties where tenants have the right to install chargers. More detailed rules provide for specific situations, such as affordable housing properties, where the act foresees a more moderate, staged process for installing chargers over time.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Stay in control with an OCPP-compliant networked charging solution<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">One approach could be to manage charger installation passively; let owners install their chargers and have them pay for it. This will, however, lead to a messy situation with various systems that are not connected and unable to communicate with each other. Load management not only becomes challenging but likely impossible, limiting your ability to scale up later and build out more chargers when needed. This will inadvertently lead to additional costs for the building owners.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In addition, the day-to-day management of a broad spectrum of different chargers will not be cost-effective. You will also have trouble charging individual units for their energy use or setting consistent charging rates, should you choose to go that route. Collecting data to analyze usage patterns and improve the system will be off-limits as well.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">As a developer, you can manage this by installing a standardized, networked charging system, ensuring that you can control the chargers, electrical load, and installation costs, while still allowing your owners and tenants to add their own charging hardware. Going with an OCPP-compliant solution like SWTCH, you can offer a choice of charging hardware but can rest easy knowing that the EV chargers won\u2019t break your electrical infrastructure as more residents add charging.\u00a0<\/span><\/p>\n<figure id=\"attachment_1830\" aria-describedby=\"caption-attachment-1830\" style=\"width: 1024px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"size-large wp-image-1830\" src=\"https:\/\/swtchenergy.com\/uploads\/2023\/03\/IMG_9242-1024x576.jpg\" alt=\"IMG_9242\" width=\"1024\" height=\"576\" srcset=\"https:\/\/swtchenergy.com\/uploads\/2023\/03\/IMG_9242-1024x576.jpg 1024w, https:\/\/swtchenergy.com\/uploads\/2023\/03\/IMG_9242-300x169.jpg 300w, https:\/\/swtchenergy.com\/uploads\/2023\/03\/IMG_9242-768x432.jpg 768w, https:\/\/swtchenergy.com\/uploads\/2023\/03\/IMG_9242-1536x864.jpg 1536w, https:\/\/swtchenergy.com\/uploads\/2023\/03\/IMG_9242.jpg 1920w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption id=\"caption-attachment-1830\" class=\"wp-caption-text\">OCPP-compliant EV Chargers being tested at SWTCH headquarters<\/figcaption><\/figure>\n<h2><span style=\"font-weight: 400;\">Harness construction cost savings and improve the building\u2019s bottom line<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">There is a substantial advantage in facing the new law head-on. You have the opportunity to install a coherent building-wide EV charging system from the outset. With a solution like <\/span><a href=\"https:\/\/swtchenergy.com\/technology\"><span style=\"font-weight: 400;\">SWTCH Control<\/span><\/a><span style=\"font-weight: 400;\">, in addition to construction savings of up to 75%, you\u2019ll set the unit owners and building managers up with a scalable charging solution that not only manages the system\u2019s energy and allows new chargers to be incrementally added, but has the potential to realize a new revenue source as you can set and manage charging rates for owners, residents, and guests.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Make sure you are ahead of the regulation coming up in 2024. <a href=\"mailto:tom.kasper@swtchenergy.com\">Get in touch today<\/a>.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Illinois will see the new Electric Vehicle Charging Act go into effect on January 1, 2024. The regulation forces new multifamily properties to offer EV charging for all residents, a tall order that could add hundreds of thousands of dollars to construction costs. For newly constructed large multifamily buildings or large multifamily buildings being renovated [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":2332,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"slim_seo":{"title":"Key Considerations for Developers under the Illinois EV Charging Act to Mitigate Costs (and Future Headaches)","description":"Illinois will see the new Electric Vehicle Charging Act go into effect on January 1, 2024. The regulation forces new multifamily properties to offer EV charging for all residents, a tall order that could add hundreds of thousands of dollars to construction costs."},"footnotes":""},"categories":[53,55],"tags":[],"class_list":["post-2330","post","type-post","status-publish","has-post-thumbnail","hentry","category-ev-insights","category-industry"],"acf":[],"lang":"en","translations":{"en":2330},"pll_sync_post":[],"_links":{"self":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts\/2330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/comments?post=2330"}],"version-history":[{"count":8,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts\/2330\/revisions"}],"predecessor-version":[{"id":2634,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/posts\/2330\/revisions\/2634"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/media\/2332"}],"wp:attachment":[{"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/media?parent=2330"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/categories?post=2330"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/swtchenergy.com\/wp-json\/wp\/v2\/tags?post=2330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}